Article Hub

Article Hub

Article Hub

Technical Articles

Written Interviews

In Focus

Media Hub

Media Hub

Media Hub

Podcasts

Webinars

Tech Talks

Power Panels

CEO Forums

Technology Showcases

Event Interviews

Other Brands

Trustworthy coverage of the transformer and transformer-related industries.

Visit Website

Trustworthy coverage of the transformer and transformer-related industries.

Visit website

Ecowende Installs Final Turbine at 760 MW Offshore Wind Farm

Van Oord and Vestas have installed the final turbine at the Ecowende offshore wind farm in the North Sea. All 52 turbines were installed from 30 May to 30 October. The site is 53 kilometres off IJmuiden in the Hollandse Kust (west), Lot VI.

Vestas supplies, installs and commissions the V236-15.0 MW turbines. Van Oord transported them from Eemshaven aboard Boreas and installed the foundations and inter-array cables. The project underscores the importance of renewable generation and grid integration.

The wind farm has an installed capacity of approximately 760 MW, equivalent to around 3% of Dutch electricity demand. It generated first power in July and is expected to become operational by the end of 2026.

Ecowende, a joint venture of Shell, Eneco and Chubu, has introduced a bird corridor, AI-based species-recognition radar and red-painted blades on seven turbines. The effectiveness of these measures in reducing bird collisions remains under study.

Source: Van Oord

411a8cec0448920ea5659ba58876f2b9

Subscribe to our Newsletter

Subscribe to our newsletter and stay ahead with the latest innovations, industry trends, and expert insights in power systems technology. Get updates on cutting-edge solutions, renewable energy advancements, and essential best practices delivered straight to your inbox.